Design & Build Garage Week 4

Four Car Garage Construction, Burnside, Glasgow

The external structure of the garage building and roof is complete and render is being applied to the external walls.

corrugated-garage-roof-glasgow

Corrugated Bitumen Roofing

Below is an image showing the chipboard underlay on the garage roof.

glasgow-roofer-builder

Here is the other side of the building with the black Corotile roofing installed.

corotile-garage-roof-glasgow3

Connection to Utilities & WC Installation

The garage has been connected to water and power to allow for a small toilet unit to be installed. The image below shows the basic external shell of the toilet has been constructed.

design-build-garage-glasgow

New Concrete Steps

New concrete slab and brick steps have been constructed to replace the old ones leading to the back door of the garage.

new-concrete-steps-glasgow-builderconcrete-steps-construction-glasgow

Keep up to date with our building and construction contracts around Glasgow and Central Scotland on our Facebook page!

See more photos of this new build garage in Burnside, Glasgow South Side, in the gallery below:

Add your comment

Your email address will not be published. Required fields are marked *