Pollokshields Sandstone Mansion Renovation Week 5

Initial Internal Fit-Out

Renewal of the gas, electrics and plumbing is in the final stages: joiners are fitting the floorboards on top of high-quality insulation wool and the plasterers are making excellent progress in every room.

glasgow-heating-engineersglasgow-renovation-plastering

Below is the kitchen and family hub before structural alteration and in it’s present state:

structural alteration open plan family room glasgow

structural-alteration-glasgow2

Plumbing Installation

The plumbing throughout the house has been renewed. In addition the plumbing has been extended from the family bathroom through one of the bedrooms and into what was previously a box room, now an en-suite for the master bedroom.

Below is a photograph showing the plumbing running under the floorboards of the bedroom, splitting to exit the building through the gable end wall next to the fireplace, and extending into the new en-suite bathroom.

plumbing-contractors-glasgow

Check out the Gallery below for more images following the progress of this Victorian House Renovation Contract in Glasgow.

Add your comment

Your email address will not be published. Required fields are marked *