Pollokshields Mansionhouse Renovation Week 8

Victorian Sandstone House Renovation Glasgow Second Fix Electrics and Interior Decorating Work This beautiful home is taking shape as the plasterwork is renewed virtually throughout the house and some painting…

Four Car Garage – Week 3

Design and Build Garage Contract, Glasgow The blockwork on the four-car garage is now complete and the roof is being prepared for felting, tiling and eventually a new black bitumen corrugated…

Replace Existing Drainage System, Burnside

This existing drainage system was CCTV surveyed and needed to be replace along its entire length. HCS Tidybuild ensured that this was done with as little disruption to the residents…